About half of the main roof is now shingled. The garage roof has been partially stripped of the old shingles. The gables are now enclosed as well.
We're meeting with a cabinet maker tomorrow night to see about kitchen designs and finishes. Hopefully we can get some decisions from that meeting to move forward with how the kitchen will be rebuilt.
I've also been working on some floor plans so that I can ensure that certain things are rebuilt the way we want them (ie we really despise the sliding closet doors which fall off the tracks all the time and want to have them replaced with regular hinged doors - I had already replaced 2 of the 4 sets this way before the fire). Plus there are small things like location of outlets that we know we want to enhance.
| The front side of the main house is shingled now. |
| The gables are up. |
| Erik was fascinated with this hole in the floor to the shower drain. |
No comments:
Post a Comment