![]() |
| What we started with. |
| What we have now! |
We still have the shutters, outside lights and trim to paint.
The floor tile for the kitchen, foyer, laundry room and powder room is all in as well as the grout. Both upstairs showers have been tiled. Light fixtures, switches and outlets have been installed upstairs (how nice to be able to turn on a light again) and most of the first floor.
![]() |
| The new kitchen floor. |
The gas has been turned back on and the upstairs furnace installation is complete and the furnace is running to help the drying process. The attic has also had all the insulation blown in.
The oak flooring is on site and waiting to be put in.
So the question that everyone is asking - When will you be able to move in? It looks good to be in with time to spare before Christmas. But we'll keep you posted.



wow it looks great. terrible pun...
ReplyDelete